multi-agent based integration of scheduling algorithms EMBA论文 | 免费论文 |
|
|
|
| |
edings of the 35th conference on decision and control, kobe, japan, december, 1996, sponsored by ieee:3849-3850
[7] koji morikawa, takeshi furuhashi, yoshiki uchikawa. evolution of cim system with genetic algorithm. ieee conference on evolutionary computation - proceedings v/2 jun 27-jun 29, 1994, sponsored by ieee: 746-749
[8] gary knotts, moshe dror, bruce c. hartman. agent-based project scheduling. iie transactions (2000) 32, 387-401
[9] albert d. baker. survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull. journal of manufacturing systems v 17 n 4 1998 sme:297-320
作者点评:
本文内容确有创新性,只不过尚有很多不成熟之处,现在需要做的是一些实验,可惜我还没有时间和精力去做。关于这个领域的研究,在我另一篇尚未刊出的综述文章中做了分类,其中提到了我的研究,因为它与其它研究是有很大不同的,当然有人对我提出的结构有看法,但是只有我做出了原型系统才能有力地支持这一观点。2002.1.3.
上一页 [1] [2] [3] [4] [5] [6] [7] [8] [9] |
|
|
|
|
|